{{::timetable.png?400|}} ---- Custom trap Goal: Get a nice trap we can duplicate Milestones * M1: Find a way to focus using chirping (Due May 22) * M2: Create a trap (Due June 5) * M3: Test the traps () Quests * Test Arb function on the frequency generator to see if it can chirp (Stephen) (Week 1) * (If the Arb function doesn’t work) Test arb function with frequency modulation to see if it can chirp (Stephen) (Week 2) * (If neither works) Come up with something that does work (Stephen) (Week 3) * Create software that produces the signal based on arbitrary point positions. (Stretch, also include circle as a primitive.) (Stephen) (Week 2-4) * Get something that produces a trap into the Rigol Arb waveform memory, and see if it traps (Stephen) (Week 3-5) ---- Test Tube Leia Goal: Get a bunch of tests automated Milestones * M1: Hold a design competition (Due May 21) * M2: Build a bunch of devices (Due May 28) * M3: Run tests (Due June 12) Quests * Make a test tube design rubric (Stephen) (Week 1) * Create software that records the time, weather it grabbed a particle, and how long the particle held up to 2 min (Someone else) (Week 1-3) * Hold the competition (First iteration) (A bunch of people) (Week 1) * Hold competition (Second iteration) (A bunch of people) (Week 2) * Manufacture 20 test tubes (Someone else) (Week 3) * Analyze the data (Stephen) (Week 6)